FLORIDA PERMIT DATA
What happens before a permit is filed
An application is the last step of a design process rather than the first. What comes before it decides how the rest goes.
Published October 2026 · Data through August 2026
FLORIDA PERMIT DATA
What this page is based on
Data through August 2026
- Matching records in our dataset
- 2,663,640
- Permit terms covered
- 398
The records come from a selected set of Florida jurisdictions with unequal coverage, and every number on this page is scoped to them. How we count.
Field note
Scope before drawings
The first useful conversation is about scope: what is being built, what it attaches to, what the property already has, and which jurisdiction will review it.
Two projects that look alike in a listing can take different paths because one alters a structural wall and the other does not. Establishing that early is cheaper than discovering it during review.
The drawing set
Most residential permits ask for a floor plan, elevations, a section or two, a site plan showing the work in relation to the property line, and details for anything unusual.
Commercial work adds life safety, egress, restrooms and ventilation to the same core. The set is sized to the review rather than to a house style.
- New single-family home matching records
- 33,583
- "new construction" matching permits
- 53,358
A permit can match more than one term, so these counts are not additive and adding two of them together overstates the total.
Who signs what
Some drawings have to be prepared and sealed by an architect, and some jurisdictions ask for a sealed set on scopes that would not require it elsewhere.
Where a sealed set is needed, the drawings have to be produced by the person signing them. A set drawn by someone else and signed afterwards is not a service this site arranges, and it is the first thing to establish before work starts.
What to bring to the first conversation
The address, the survey if there is one, photographs of the existing condition, any notice the jurisdiction has already sent, and a plain description of what you want to end up with.
That is enough to say what the project needs, what it does not need, and which of the two is the more useful conversation to have first.
Keep reading
More from the data library
Tell us what you are building
Send the project details once and you will get the scope, the drawings it needs and a price.
Prefer to talk it through? (321) 462-5592 or ask@floridaarch.com