GLOSSARY

After the Fact

After the fact is the label used for work recorded after it has already been built, often written as unpermitted or no-permit work. In the records we hold the term describes the timing of the record, not a different kind of construction.

Detail

About After the Fact

An after-the-fact record carries the same scope as the work it describes, but it starts from what exists rather than from a set of drawings. Because of that, the record usually includes a survey or documentation of the built condition so the work can be measured against the standard that applies. After-the-fact records commonly appear with code compliance, demolition and remodel headings.

FLORIDA PERMIT DATA

In the records

"after the fact" appears in 3,240 matching permits in the Florida records we analyzed.

A permit can match more than one term, so these counts are not additive and adding two of them together overstates the total.

Related

See also

Insights

Readings of the records

Tell us what you are building

Send the project details once and you will get the scope, the drawings it needs and a price.

Prefer to talk it through? (321) 462-5592 or ask@floridaarch.com

Request a quote