Storm season and the drawings it asks for
Wind requirements in Florida are settled on paper long before a storm arrives, and most of them are settled at the openings.
Published October 2026 · Data through August 2026
FLORIDA PERMIT DATA
What this page is based on
Data through August 2026
- Matching records in our dataset
- 2,663,640
- Permit terms covered
- 398
The records come from a selected set of Florida jurisdictions with unequal coverage, and every number on this page is scoped to them. How we count.
Field note
Openings are the first question
Impact-rated windows, shutters and doors are the protection most projects touch, and a permit for them has to show the product, its rating and how it is fixed to the structure.
Roof covering and the connections between roof and wall are the other half of the same question, and they are what an insurer asks about after the openings are done.
- "impact window" matching permits
- 29,761
- "shutter" matching permits
- 42,438
- "window replacement" matching permits
- 207,112
- "hurricane screen" matching permits
- 10,102
A permit can match more than one term, so these counts are not additive and adding two of them together overstates the total.
The records have a rhythm for it
Roofing and opening work in the records leans into late winter and spring, ahead of the rain season, while mechanical work peaks with the heat.
That rhythm is about water and heat rather than about storms. It is nonetheless the reason a set prepared early tends to move through a busier calendar more comfortably than one prepared late.
- Roofing busiest month
- March
- Index against an average month
- 1.21
- Windows Doors busiest month
- June
- Index against an average month
- 1.12
- Hvac busiest month
- June
- Index against an average month
- 1.20
The index compares each month with an average month in the records, so it describes a lean in the year rather than a deadline.
What an older building needs
A house built before the current wind provisions can be brought up to them in stages: openings first, then roof covering, then the connections if the roof is opened for other work.
Each stage is a permit of its own, and the drawings for one are not the drawings for the next. Doing them in a sensible order is what stops the same wall being opened twice.
What this site will not say
Nothing here states a review time, a fee or a likelihood of approval. The records contain none of those things, and each jurisdiction publishes its own process.
The service offered here is the drawing set, the code path it follows, and the response to whatever the reviewer asks for.
Keep reading
More from the data library
Tell us what you are building
Send the project details once and you will get the scope, the drawings it needs and a price.
Prefer to talk it through? (321) 462-5592 or ask@floridaarch.com